The Earthtimes online News
Home


VMS Ventures Inc.: Hole RD-08-26 Assays 21.15m of 2.57% Cu and 3.13% Zn; RD-08-22 Assays 25.67m of 0.96% Cu and 4.37% Zn and Hole 08-34 has 35.73m of NSS

Posted : Thu, 20 Mar 2008 10:30:42 GMT
Author : VMS Ventures Inc.
Category : Press Release
News Alerts by Email click here )
Create your own RSS
News | Home
VANCOUVER, BRITISH COLUMBIA -- 03/20/08 -- VMS Ventures Inc. (TSX VENTURE: VMS) (the Company) is pleased to report an update of its ongoing exploration program at the Reed Project Discovery Zone near Snow Lake, Manitoba.

Highlights:

RD-08-26: 21.15m (69.39 ft) grading 2.57% Cu, 3.13% Zn

- Including: 3.56m (11.68 ft) grading 7.13% Cu, 2.80% Zn

- Including: 9.45m (31.00 ft) grading 2.57% Cu, 7.22% Zn

RD-08-22: 25.67m (84.22 ft) grading 0.96% Cu, 4.37% Zn

RD-08-29: 11.55m (37.89 ft) of Near Solid Sulphides, Assays Pending

RD-08-34: 35.73m (117.22 ft) of Near Solid Sulphides, Assays Pending

Dr. George Gale, Vice President of Exploration, states: "Drilling continues to extend the limits of the deposit. Assay data and features visible in drill core indicate that the Discovery Zone mineralization may be part of a large debris flow. The significance is that the mineralization may have slid into its present position from a peripheral source, which could potentially represent the main body of mineralization. Further evidence of this is that the intense alteration typically associated with the centre of a VMS system is lacking. The fourth phase of drill holes is underway, which are planned as deeper holes to test these observations."


TABLE I
DRILLHOLES
ASSAYS FOR RD-08-15, RD-08-22 and RD-08-26

---------------------------------------------------------------------------
DRILL          FROM        TO      INT       Cu       Zn       Au        Ag
HOLE             (m)       (m)      (i)       %        %      g/t       g/t
---------------------------------------------------------------------------
RD-08-15     260.38    262.43     2.05     3.13     0.29     0.44      9.92
---------------------------------------------------------------------------
 and         264.54    266.00     1.46     0.93     2.32     0.32      5.26
---------------------------------------------------------------------------
RD-08-22      96.97    122.64    25.67     0.96     4.37     0.76     11.39
---------------------------------------------------------------------------
RD-08-26      61.70     82.85    21.15     2.57     3.92     0.87     15.97
---------------------------------------------------------------------------
 inc          66.28     69.84     3.56     7.13     2.80     1.93     36.74
---------------------------------------------------------------------------
 and         121.85    133.90    12.05     2.98     2.65     0.86     12.19
---------------------------------------------------------------------------
 inc         127.70    133.90     6.20     4.16     2.82     1.06     16.75
---------------------------------------------------------------------------
(i) True thickness unknown


TABLE II
DRILLHOLE INTERVAL DETAILS

------------------------------------------------------------------------
                                         INTERVAL
                   FROM           TO           (i)
DRILLHOLE            (M)          (M)          (M)     DESCRIPTION
------------------------------------------------------------------------
RD-08-21              -            -            -      No Sulphide
------------------------------------------------------------------------
RD-08-22          96.89       122.64        25.75      NSS
------------------------------------------------------------------------
RD-08-23              -            -            -      No Sulphide
------------------------------------------------------------------------
RD-08-24              -            -            -      No Sulphide
------------------------------------------------------------------------
RD-08-25              -            -            -      No Sulphide
------------------------------------------------------------------------
RD-08-26          61.70        82.85        21.15      NSS
------------------------------------------------------------------------
 inc              66.28        69.84         3.56      NSS
------------------------------------------------------------------------
 and             121.85       133.90        12.05      NSS
------------------------------------------------------------------------
 inc             127.70       133.90         6.20      NSS
------------------------------------------------------------------------
RD-08-27              -            -            -      No Sulphide
------------------------------------------------------------------------
RD-08-28              -            -            -      No Sulphide
------------------------------------------------------------------------
RD-08-29         135.00       164.25        11.25      NSS
------------------------------------------------------------------------
RD-08-30         136.70       159.38        22.68      NSS
------------------------------------------------------------------------
RD-08-31              -            -            -      In Progress
------------------------------------------------------------------------
RD-08-32              -            -            -      No Sulphide
------------------------------------------------------------------------
RD-08-33                                               Sulphide Veinlets
------------------------------------------------------------------------
RD-08-34         167.92       203.65        35.73      NSS
------------------------------------------------------------------------
(i) True thickness is unknown


TABLE III
DRILLHOLE LOCATION-EOH-DIP-AZIMUTH

-------------------------------------------------------------------------
HOLE_ID        NORTH      EAST        LENGTH           DIP        AZIMUTH
-------------------------------------------------------------------------
RD-08-21     6048775    393978        256.22   -45 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-22     6048817    393940        163.67   -60 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-23     6048775    393978        274.02   -45 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-24     6048838    393916        209.39   -45 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-25     6048765    393914        187.00   -45 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-26     6048838    393916        145.39   -60 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-27     6048765    393914        275.00   -60 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-28     6048845    393875        124.05   -45 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-29     6048782    393893        182.37   -45 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-30     6048845    393875        273.41   -60 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-31     6048782    393893   In Progress   -60 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-32     6048819    393835        288.63   -45 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-33     6048819    393835        380.06   -75 degrees    045 degrees
-------------------------------------------------------------------------
RD-08-34     6048819    393835        301.30   -60 degrees    045 degrees
-------------------------------------------------------------------------

Drillholes that have not intersected sulphide mineralization to date are located east of the fault intersected in holes RD-08-16 and RD-08-25 or into the hanging wall rocks above a low angle shear intersected in drillholes RD-08-18, RD-08-23, RD-08-24, RD-08-28, and RD-08-32.

There are three drills operating on the property. One drill has started Phase Four drilling on the Discovery Zone to test for mineralization down-dip of the known mineralization. Phase Four drillholes are targeted to test the potential down dip mineralization at depths of 250m to 300m beneath the surface. The other two drill rigs are now testing separate airborne geophysical VTEM anomalies located in swampy areas between 1km to 3km northeast of the Discovery Zone. These targets are not easily accessible after breakup. These drill rigs will be redeployed on the Discovery Zone in April.

An additional 65 line kilometers are now completed on the property to extend the grid to the north and east in order to follow anomalies detected at the edge of the previous survey. Down hole geophysical surveys will be conducted on the cased bore holes in the coming weeks along with a continuation of the Deep EM survey. HLEM survey results are now being received and analyzed.

All technical information in this release has been reviewed by the Qualified Person, Dr. George Gale, P.Eng. Samples are prepared and analyzed at TSL Laboratories in Saskatoon, Saskatchewan using ICP-MS and Fire Assay analytical methods.

VMS Ventures Inc. is focused primarily on acquiring, exploring and developing copper-zinc properties in the Flin Flon-Snow Lake VMS Belt. The Company also holds the largest land package considered prospective for nickel-copper mineralization at Lynn Lake, which is to date Canada's third largest nickel producing camp. The Company's project portfolio consists of the Snow Lake VMS project, the Lynn Lake Gabbros nickel-copper project, the Nickel Belt project, the South Bay nickel-copper-cobalt PGE property, and the Eden Lake Carbonatite Complex, Specialty Metals property. All VMS Ventures Inc. properties are located in the mining friendly province of Manitoba, Canada.

ON BEHALF OF THE BOARD OF DIRECTORS

John Roozendaal B.Sc., President & Director



The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this news release.

Contacts:
VMS Ventures Inc.
Keith Patey
Director of Communications
(604) 986-2020 or Toll Free: 1-866-816-0118
(604) 986-2021 (FAX)
Website: www.vmsventures.com

Coal Harbor Communications
Dale Paruk
(604) 662-4505 or Toll Free: 1-877-642-6200


Copyright © 2008 Market Wire. All rights reserved.



Article : VMS Ventures Inc.: Hole RD-08-26 Assays 21.15m of 2.57% Cu and 3.13% Zn; RD-08-22 Assays 25.67m of 0.96% Cu and 4.37% Zn and Hole 08-34 has 35.73m of NSS
Print this article
Share this article

Share on

Have your Say
Name
Email
Subject
Your Comment

Enter Verification code
 
  

 


Choose Theme
Green Earth Blue Earth Orange Earth Purple Earth

Search
 
You can

Current News

News Category
Business
Entertainment
Environment
General
Health
Sports
Technology
World

About us | News Archives | Browse old Archive | Feedback | Disclaimer | Mobile/PDA | News Alerts

The views expressed in the articles are not necessarily those of earthtimes.org and we accept no responsibility for the views or opinions
expressed in the articles either direct or indirect.

© 2008 www.earthtimes.org, The Earth Times, All Rights Reserved | Privacy Policy